1. <dd id="eul4i"></dd>

  2. <sub id="eul4i"></sub>
    <wbr id="eul4i"><th id="eul4i"></th></wbr>
    <form id="eul4i"><legend id="eul4i"></legend></form>

    <nav id="eul4i"><code id="eul4i"><blockquote id="eul4i"></blockquote></code></nav>
    <nav id="eul4i"></nav>
  3. <nav id="eul4i"><listing id="eul4i"></listing></nav>
    1. Case

      Strengthening

      Strengthening

      Location:Home > Case Strengthening Strengthening

      Shenzhen Chunfeng Road elevated maintenance and reinforcement project
      2020-08-14 10:05:43

      1597370692367736.jpg


             Located in Luohu District, Shenzhen, Chunfeng Road is an important traffic road in Shenzhen. The 2017 Chunfeng Road viaduct inspection determined that the bridge is a Type C bridge. In order to improve the safety margin of the bridge, the design uses prestressed carbon fiber panels to improve the bridge's bearing capacity. The ZFPR100-1.4 prestressed carbon fiber reinforcement system of our company is used in this project. The specification of the carbon plate is 100*1.4mm, the length is 9~15 meters, the design tension is 1000MPa, and the reinforcement work is guided by our company.

      苍井空浴缸大战猛男120分钟,十八禁啪啦拍无遮拦视频,女同事醉酒被迷奷系列在线,天天躁日日躁狠狠躁超碰97